Abstract

Background: The outbreak of a Covid-19 pandemic changed the working patterns of software projects delivery. Aim: The study examines how the work from home (WFH) impacted the software project execution for emergence of differentiating patterns. Method: The data on project execution in two country locations was examined. The population is 3711 projects across 52 months (26 pre- and 26 post-pandemic) is analyzed. The paper identifies the changed patterns of execution. Results: WFH resulted in a more frequent reporting of the project status, significantly higher granularity of reporting, small changes in the statuses reported and significant changes in the duration of a project in a given status. Conclusion: The study concludes that the WFH have had overall positive impact on the software project execution, but notices that it was achieved with increase in reporting frequency and granularity.

Recommended Citation

Chabik, J. (2024). Impact of Work from Home on Agile Software Project Execution -- The Empirical Study. In B. Marcinkowski, A. Przybylek, A. Jarzębowicz, N. Iivari, E. Insfran, M. Lang, H. Linger, & C. Schneider (Eds.), Harnessing Opportunities: Reshaping ISD in the post-COVID-19 and Generative AI Era (ISD2024 Proceedings). Gdańsk, Poland: University of Gdańsk. ISBN: 978-83-972632-0-8. https://doi.org/10.62036/ISD.2024.65

Paper Type

Short Paper

DOI

10.62036/ISD.2024.65

Share

COinS
 

Impact of Work from Home on Agile Software Project Execution -- The Empirical Study

Background: The outbreak of a Covid-19 pandemic changed the working patterns of software projects delivery. Aim: The study examines how the work from home (WFH) impacted the software project execution for emergence of differentiating patterns. Method: The data on project execution in two country locations was examined. The population is 3711 projects across 52 months (26 pre- and 26 post-pandemic) is analyzed. The paper identifies the changed patterns of execution. Results: WFH resulted in a more frequent reporting of the project status, significantly higher granularity of reporting, small changes in the statuses reported and significant changes in the duration of a project in a given status. Conclusion: The study concludes that the WFH have had overall positive impact on the software project execution, but notices that it was achieved with increase in reporting frequency and granularity.